GAS TREATMENT PLANT – Coke Oven Batteries (COB)

Key Activities:

  • AVEVA E3D Modelling
  • Piping Detail Engineering Deliverables
  • Piping Stress Analysis
  • Civil & Structural Design Calculations & Drawings
  • Buildings & Shelters Architectural Drawings
  • Electrical Detail Engineering Deliverables
  • Instrumentation & Telecom Detail Engineering Deliverables
Scope Of Work

Multi-disciplinary Design and Detail engineering including 3D modeling using AVEVA E3D for Units comprising of Primary Gas Cooler Unit, Electrostatic Tar Precipitator, Gas Exhauster unit, H2S/NH3 & Naphthalene Scrubbers unit, Naphthalene recovery unit, Tar Separation Unit, Tar Storage unit, Gravel filters unit, BFW unit, Ammonia still and Dissociator unit, Claus SRU and sulphur storage, Sulphur solidification unit, NaOH storage unit, Chiller water plant, Cooling tower station, Condensate system, Gas boosting station, Electrical building and control room (EC), Boiler house unit, Fire water system Units in the disciplines of Piping, Mechanical, Civil & Structural, Electrical and Instrumentation.

Project Details

Project Name : GAS TREATMENT PLANT - Coke Oven Batteries (COB)

Owner: Arcelor Mittal Nippon Steel (AMNS)

Project Location: Hazira, India

Duration: 18 Months

Related Projects

Welcome to ANEWA Engineering

ANEWA Engineering is a leading global Design, Detailed Engineering, EPC Support & Consulting Company carrying out services primarily In Upstream, Midstream and Downstream sectors of the Oil & Gas, Chemical, Fertilizer, Steel, Pharmaceutical, Paper, Power, and Infrastructure Industries.

Office
16th Floor, Manjeera Trinity Corporate,
JNTU  Hitech City Road, Hyderabad, Telangana, India – 500072
Tel: +91 –40– 40326 770