Skip to content Skip to footer

BAB 485 SUSTAINABLE

Key Activities:

  • Intergraph PDS 3D Modelling
  • Piping Detail Engineering Deliverables
  • Piping Stress Analysis
  • Civil & Structural Design Calculations & Drawings
  • Preparation of Bar Bending Schedules
  • Electrical Detail Engineering Deliverables
  • Instrumentation Detail Engineering Deliverables
  • HSE Layouts

 

Scope Of Work

Design detail engineering and preparation of 3D model for BAB 485 MBOPD project using PDS Software which includes Equipment , Piping, Civil and Structural, Electrical Cable trays/trenches, duct banks, Electrical Equipment inside buildings, Earthing activities, Transformers, Electrical Distribution boards, Junction boxes , Lighting and small power equipment, Outdoor/Indoor Lighting, Field instruments, Gas detector poles, Lighting and CCTV etc., in line with client standards and specifications

Project Details

Project Name : BAB 485 SUSTAINABLE PROJECT

Owner: ADNOC

Project Location: UAE

Duration: 12 Months

Related Projects

Welcome to ANEWA Engineering

ANEWA Engineering is a leading global Design, Detailed Engineering, EPC Support & Consulting Company carrying out services primarily In Upstream, Midstream and Downstream sectors of the Oil & Gas, Chemical, Fertilizer, Steel, Pharmaceutical, Paper, Power, and Infrastructure Industries.

Office
16th Floor, Manjeera Trinity Corporate,
JNTU  Hitech City Road, Hyderabad, Telangana, India – 500072
Tel: +91 –40– 40326 770